Is BP’s Blow Out Preventer Falling Off The Well Pipe?

After a video was released on June 13th recorded from BP’s underwater Viking Poseidon ROV 1 operating in the Gulf of Mexico near the blown out Macondo Well site showing what appeared to be oil leaks from gulf seabed cracks around BP’s well site, it seemed that it would be only a question of time before an oil saturated gulf seabed turning to wet slippery jello would no longer have the structural strength to support the weight of BP’s large steel 450 ton Blow Out Preventer (BOP) apparatus sitting on top of the well pipe projecting from that seabed.

“http://www.antemedius.com/files/images/BOP.jpg